A worked example / No signup to read

A contractor estimate example, from scope to invoice.

A useful estimate explains the work behind the number. Follow one fictional trim replacement, check the arithmetic, and see how an extra section changes the record.

These numbers are invented for the example. They are sample selling prices, not market rates, supplier quotes, cost estimates or a recommendation for what to charge. This is not a customer quote, contract, or legal or tax advice. Use your own measurements, current prices and project requirements.

1. Write the scope before the price

Sample job: replace 60 linear feet of interior baseboard in one room. Remove the existing trim, supply a matching primed profile, cut and install the replacement, then fill, caulk and finish the replaced trim.

2. Show quantities, units and sample arithmetic

The installed quantity is 60 feet. The material quantity is 66 feet: 60 × 1.10 = 66, allowing 10% for cuts in this fictional example. Installation and finishing are still priced on 60 installed feet; the extra material is not counted as extra installed work.

Sample estimate E-001, revision 1 — fictional work subtotal
Line and quantitySample selling-price calculation
Protect area and remove old trim: 60 linear feet60 × $4 = $240
Supply replacement trim: 66 linear feet66 × $3 = $198
Cut, fit and install: 60 linear feet60 × $7 = $420
Fill, caulk and finish replacement: 60 linear feet60 × $3 = $180
Sample work subtotal$240 + $198 + $420 + $180 = $1,038

This example does not model tax, fees, permit charges, discounts or payment terms. The $1,038 is a work subtotal, not a final payable amount. Determine and display the appropriate treatment for a real job separately. The sample line prices do not establish your cost, markup or profit.

3. Keep additions separate from the accepted version

Suppose the customer later asks for another 10 feet of the same trim under the same fictional assumptions. Label that request separately, such as change CO-001, and keep the earlier revision. Record the added scope, price and approval before relying on the change.

Sample change subtotal: $40 + $33 + $70 + $30 = $173. The revised sample work subtotal is $1,038 + $173 = $1,211, before the unmodeled items above. Do not include the extra 10 feet in both the original scope and the change.

4. Prepare the invoice handoff

Keep the accepted estimate revision, scope decisions, supporting photos and approved change with the job. Before preparing an invoice, reconcile the work you are billing to those records. In this example the original work plus the sample change is $1,211 before any applicable tax or other separately determined amounts.

Use the 16-point estimate checklist for the full review. If you are comparing tools, read how to choose contractor estimating software.

Try a draft with one sample job

Rivetra keeps the estimate, job documents, photos and invoice in one company workspace. Start with fictional client details and your own line descriptions and prices. Follow the five-step first-estimate guide, then stop at the preview to review the result.

Current account-access and subscription terms apply. Sending documents, billing real work and recording payments are later decisions.